Difference between revisions of "Alternative Summary Results"
Jump to navigation
Jump to search
Line 13: | Line 13: | ||
|- | |- | ||
| Terminal Value Year||yr||One year after the end of the planning horizon. This is the year the Terminal Value refers to. | | Terminal Value Year||yr||One year after the end of the planning horizon. This is the year the Terminal Value refers to. | ||
+ | |- | ||
+ | | Alternative Included||true||Dummy indicator used in optimization model to avoid zero-indexing | ||
|- | |- | ||
[[Category:Result Variables]] | [[Category:Result Variables]] |
Revision as of 16:01, 19 February 2016
Variable name | Unit | Description |
Discount Rate | % | Real discount rate used when calculating net present value |
Net present value | SEK/ha | Sum of all future discounted revenues minus cost for an approximately infinite time horizon |
Terminal Value | SEK/ha | Residual part of the net present value at the end of the planning horizon |
Soil Expectation Value | SEK/ha | Net present value for the last rotation simulated (read more about it here) |
Terminal Value Year | yr | One year after the end of the planning horizon. This is the year the Terminal Value refers to. |
Alternative Included | true | Dummy indicator used in optimization model to avoid zero-indexing |