Difference between revisions of "Alternative Summary Results"

From Heureka Wiki
Jump to navigation Jump to search
 
(12 intermediate revisions by the same user not shown)
Line 1: Line 1:
[[ResultCategoryDescription::This result group contains results for each treatment unit and management alternative. In common for this group is that the variables has no time index.]]
+
This result group contains: [[ResultCategoryDescription:: Results for each treatment unit and management alternative. In common for this group is that the variables has no time index.]]
 +
 
  
 
{| {{table}}
 
{| {{table}}
Line 8: Line 9:
 
| Discount Rate||%||Real discount rate used when calculating net present value
 
| Discount Rate||%||Real discount rate used when calculating net present value
 
|-
 
|-
| [[Net present value]]||SEK/ha||[[Net present value|Sum of all future discounted revenues minus cost for an approximately infinite time horizon]]
+
| [[Net present value|Net Present Value (Nuvärde)]]||SEK/ha||[[Net present value|Sum of all future discounted revenues minus costs for an approximately infinite time horizon]]
 
|-
 
|-
| Terminal Value||SEK/ha||Residual part of the net present value at the end of the planning horizon
+
| [[Net present value#Soil expectation value|Soil Expectation Value (Markvärde)]]||SEK/ha||Net present value for the last rotation simulated (read more about it [[Net present value|here]])
 
|-
 
|-
| Soil Expectation Value||SEK/ha||Net present value for the last rotation simulated (read more about it [[Net present value|here]])
+
| [[Net present value#Terminal value|Terminal Value]]||SEK/ha||Residual part of the net present value at the end of the planning horizon
 
|-
 
|-
| Terminal Value Year||yr||One year after the end of the planning horizon. This is the year the Terminal Value refers to.
+
| [[Net present value#Terminal value|Terminal Value Year]]||yr||One year after the end of the planning horizon. This is the year the Terminal Value refers to.
 
|-
 
|-
 
| Alternative Included||true||Dummy indicator used in optimization model to avoid zero-indexing
 
| Alternative Included||true||Dummy indicator used in optimization model to avoid zero-indexing
 
|-
 
|-
 +
|}
 +
 
[[Category:Result Variables]]
 
[[Category:Result Variables]]

Latest revision as of 11:53, 7 March 2016

This result group contains: Results for each treatment unit and management alternative. In common for this group is that the variables has no time index.


Variable name Unit Description
Discount Rate % Real discount rate used when calculating net present value
Net Present Value (Nuvärde) SEK/ha Sum of all future discounted revenues minus costs for an approximately infinite time horizon
Soil Expectation Value (Markvärde) SEK/ha Net present value for the last rotation simulated (read more about it here)
Terminal Value SEK/ha Residual part of the net present value at the end of the planning horizon
Terminal Value Year yr One year after the end of the planning horizon. This is the year the Terminal Value refers to.
Alternative Included true Dummy indicator used in optimization model to avoid zero-indexing