View Issue Details
ID | Project | Category | View Status | Date Submitted | Last Update |
---|---|---|---|---|---|
0000243 | Heureka | TPG | public | 2019-01-21 15:58 | 2019-01-31 13:19 |
Reporter | Peder | Assigned To | Linus | ||
Priority | normal | Severity | minor | Reproducibility | always |
Status | closed | Resolution | fixed | ||
Product Version | 2.12.2 | ||||
Fixed in Version | 2.12.3 | ||||
Summary | 0000243: Takes verý long time to cancel TPG simulation | ||||
Description | Om man avbryter en TPG med många tu, t ex 10000 st, precis när man har startat den under fasen "Setting aside for nature conservation..." , så tar det märkligt lång tid att avbryta. Saknas det kod som fångar "pending Cancel" när NC-ytor ska skapas? | ||||
Steps To Reproduce | 1. Se till Area Proportion = 10% i kontrolltabell Nature Conservation 2. Starta TPG med t ex 10000 hexagoner. 3. Avbryt när status message = "Loading treatment units..." | ||||
Tags | No tags attached. | ||||
Product | General | ||||
Date Modified | Username | Field | Change |
---|---|---|---|
2019-01-21 15:58 | Peder | New Issue | |
2019-01-21 15:58 | Peder | Status | new => assigned |
2019-01-21 15:58 | Peder | Assigned To | => Linus |
2019-01-22 15:09 | Linus | Status | assigned => closed |
2019-01-22 15:09 | Linus | Resolution | open => fixed |
2019-01-22 15:09 | Linus | Note Added: 0000249 | |
2019-01-31 13:19 | Linus | Fixed in Version | => 2.12.3 |