Difference between revisions of "Alternative Summary Results"
Jump to navigation
Jump to search
(Created page with " Category:Result Variables") |
|||
| (15 intermediate revisions by the same user not shown) | |||
| Line 1: | Line 1: | ||
| + | This result group contains: [[ResultCategoryDescription:: Results for each treatment unit and management alternative. In common for this group is that the variables has no time index.]] | ||
| + | |||
| + | |||
| + | {| {{table}} | ||
| + | | align="left" style="background:#f0f0f0;width: 30%;"|'''Variable name''' | ||
| + | | align="left" style="background:#f0f0f0;width: 20%;"|'''Unit''' | ||
| + | | align="left" style="background:#f0f0f0;width: 50%;"|'''Description''' | ||
| + | |- | ||
| + | | Discount Rate||%||Real discount rate used when calculating net present value | ||
| + | |- | ||
| + | | [[Net present value|Net Present Value (Nuvärde)]]||SEK/ha||[[Net present value|Sum of all future discounted revenues minus costs for an approximately infinite time horizon]] | ||
| + | |- | ||
| + | | [[Net present value#Soil expectation value|Soil Expectation Value (Markvärde)]]||SEK/ha||Net present value for the last rotation simulated (read more about it [[Net present value|here]]) | ||
| + | |- | ||
| + | | [[Net present value#Terminal value|Terminal Value]]||SEK/ha||Residual part of the net present value at the end of the planning horizon | ||
| + | |- | ||
| + | | [[Net present value#Terminal value|Terminal Value Year]]||yr||One year after the end of the planning horizon. This is the year the Terminal Value refers to. | ||
| + | |- | ||
| + | | Alternative Included||true||Dummy indicator used in optimization model to avoid zero-indexing | ||
| + | |- | ||
| + | |} | ||
[[Category:Result Variables]] | [[Category:Result Variables]] | ||
Latest revision as of 10:53, 7 March 2016
This result group contains: Results for each treatment unit and management alternative. In common for this group is that the variables has no time index.
| Variable name | Unit | Description |
| Discount Rate | % | Real discount rate used when calculating net present value |
| Net Present Value (Nuvärde) | SEK/ha | Sum of all future discounted revenues minus costs for an approximately infinite time horizon |
| Soil Expectation Value (Markvärde) | SEK/ha | Net present value for the last rotation simulated (read more about it here) |
| Terminal Value | SEK/ha | Residual part of the net present value at the end of the planning horizon |
| Terminal Value Year | yr | One year after the end of the planning horizon. This is the year the Terminal Value refers to. |
| Alternative Included | true | Dummy indicator used in optimization model to avoid zero-indexing |