Version 1.9.2: Difference between revisions
Jump to navigation
Jump to search
| Line 26: | Line 26: | ||
<!--Note: If you want to harvest trees with diameter (dbh) less than �??Min Diameter in Final Fellings�?� for extraction as harvest residues, you should set the minimum diameter to for example 5. Then these trees will be included in the cost calculation for the harvester, and also be available as extractable harvest residues. --> | <!--Note: If you want to harvest trees with diameter (dbh) less than �??Min Diameter in Final Fellings�?� for extraction as harvest residues, you should set the minimum diameter to for example 5. Then these trees will be included in the cost calculation for the harvester, and also be available as extractable harvest residues. --> | ||
* In reports over treatment data results or financial results, such as volume harvested, and when at the same time | *In reports over treatment data results or financial results, such as volume harvested, and when at the same time a numeric-type conditions has been used from treatment data (such as "volume harvested where dgv of harvested trees is at least 20 cm"), results were wrong (larger values with than without condition!). This has now been fixed. | ||
*Result variables belonging to categories "StandObjectData" and "TreatmentUnit" were not available as condition variables in the report builder. This has been fixed. | *Result variables belonging to categories "StandObjectData" and "TreatmentUnit" were not available as condition variables in the report builder. This has been fixed. | ||