Version 1.6: Difference between revisions

From Heureka Wiki
Jump to navigation Jump to search
No edit summary
Line 66: Line 66:
==Other stuff you should know==
==Other stuff you should know==
*When using period midpoints in PlanWise strategic TPG, period 0 now refers to year 0, not year 2.5. Instead, period 1 refers to year 2.5, and so forth. Hence, period 0 is 2.5 years long, followed by a series of 5-year period. The problem have been that treatments applied in year 0, for example regeneration in recently clear cut stands, were not reported when using period midpoint, but now they are. Note that '''no regular harvesting''' will take place in period 0, only removal of existing seed trees and shelterwoods. This will probably affect existing optimization models, if you have restrictions that include harvesting in period 0. Add condition �??with p > 0�?� when declaring such constraints, for example "forall <p> in periods with p > 0 do�?�"
*When using period midpoints in PlanWise strategic TPG, period 0 now refers to year 0, not year 2.5. Instead, period 1 refers to year 2.5, and so forth. Hence, period 0 is 2.5 years long, followed by a series of 5-year period. The problem have been that treatments applied in year 0, for example regeneration in recently clear cut stands, were not reported when using period midpoint, but now they are. Note that '''no regular harvesting''' will take place in period 0, only removal of existing seed trees and shelterwoods. This will probably affect existing optimization models, if you have restrictions that include harvesting in period 0. Add condition �??with p > 0�?� when declaring such constraints, for example "forall <p> in periods with p > 0 do�?�"
*A set of report templates (in Swedish!) can be downloaded from ftp://salix.slu.se/download/Heureka/Rapportmallar/. See the readme-file there for instructions were to put the templates. A very nice Overview template is available.
*A set of report templates (in Swedish!) can be downloaded from ftp://salix.slu.se/download/Heureka/Rapportmallar/. See the readme-file there for instructions were to put the templates. One useful template is


==Known issues==
==Ongoing activities==


==Next release==
==Next release==
*A new stand register version will be released. This version has columns for initial dead wood volume.
*Date is not decided...
 
*A new stand register version (2) will be released (actually PlanStart supports it but we have not documented it yet). The new version has columns for initial dead wood volume. The previuous version (1) will still be supported.
The volume after harvesting is basically determined by the Swedish Forest Act, SVL§ 10, which dictates the minimum volume required after harvesting as a function of mean height (mean height as x-variable in the diagram). The implementation has been modified too the following: Set x = min of site index and mean height. Also, truncate the x-variable to at least 12 and at most 30.

Revision as of 13:45, 11 November 2011