Difference between revisions of "Test"

From Heureka Wiki
Jump to navigation Jump to search
Line 25: Line 25:
 
* When importing a pricelist with the same identifier as a pricelist already present in the project, it was not saved. This has been fixed.
 
* When importing a pricelist with the same identifier as a pricelist already present in the project, it was not saved. This has been fixed.
 
*In timber pricelists, there is a column called Waste (vrak). The copy and paste function did not include this column. This has been fixed.
 
*In timber pricelists, there is a column called Waste (vrak). The copy and paste function did not include this column. This has been fixed.
*Resetting percent values in control table TreatmentModel now works as expected.
+
*Resetting Utilization Grade values to default values in control table TreatmentModel now works as expected.
 
*The default value for plant density in RegenerationSettings dialog in control table ProductionModel is now properly saved.  
 
*The default value for plant density in RegenerationSettings dialog in control table ProductionModel is now properly saved.  
 
*For biofuel extraction, a model is used to calculate how much of the needle biomass that is located in the (cut) tree top. For this calculation, the length of the tree top is used, which is obtained by multiplying with tree top proportion. Instead of using proportion of length, proportion of volume was used instead, which may have overestimated the amount of needles extracted. This has been fixed.
 
*For biofuel extraction, a model is used to calculate how much of the needle biomass that is located in the (cut) tree top. For this calculation, the length of the tree top is used, which is obtained by multiplying with tree top proportion. Instead of using proportion of length, proportion of volume was used instead, which may have overestimated the amount of needles extracted. This has been fixed.

Revision as of 13:11, 8 March 2013