Difference between revisions of "Version 1.6"

From Heureka Wiki
Jump to navigation Jump to search
Line 65: Line 65:
  
 
==Other stuff you should know==
 
==Other stuff you should know==
*When using period midpoints in PlanWise strategic TPG, period 0 now refers to year 0, not year 2.5. Period 1 refers to year 2.5, and so forth. The problem was that treatments applied in year 0, for example regeneration of bare lands
+
*When using period midpoints in PlanWise strategic TPG, period 0 now refers to year 0, not year 2.5. Period 1 refers to year 2.5, and so forth. The problem was that treatments applied in year 0, for example regeneration in recently clear cut stands
 
*A set of report templates (in Swedish!) can be downloaded from ftp://salix.slu.se/download/Heureka/Rapportmallar/. See the readme-file there for instructions were to put the templates. A very nice Overview template is available.
 
*A set of report templates (in Swedish!) can be downloaded from ftp://salix.slu.se/download/Heureka/Rapportmallar/. See the readme-file there for instructions were to put the templates. A very nice Overview template is available.
 +
 
==Known issues==
 
==Known issues==
  

Revision as of 14:35, 11 November 2011