Difference between revisions of "ControlTable Treatment Program Generator"

From Heureka Wiki
Jump to navigation Jump to search
Line 1: Line 1:
 
[[Category:Control Tables]]
 
[[Category:Control Tables]]
In the treatment program control table you can configure how treatment programs are generated.
+
In the treatment program generator control table you can configure how treatment programs are generated.
  
 
== Program Restrictions ==
 
== Program Restrictions ==

Revision as of 16:58, 18 August 2009

In the treatment program generator control table you can configure how treatment programs are generated.

Program Restrictions

Allows you to control how treatment programs are generated, and how many treatment programs that are generated.

CcDelayMax

Defines the maximum periods to wait with clearcut after the lowest allowable stand age for clearcutting has been reached.

CcDelayMin

Defines the minimum periods to wait with clearcut after the lowest allowable stand age for clearcutting has been reached.

CcWait

Defines the minimum periods between thinning and clearcut.

MaxAlternatives

Defines the maximum number of alternatives that can be generated for a treatment unit.

Model

Defines whether several forest generations are saved in the same alternative (model 1) or if the first and second generations are saved separately (model 2).

ThinningVar

Defines how many periods to vary the first thinning with.

Management Systems

Allows you to select the types of management systems to generate treatment programs for.

EvenAged

Generate alternatives for even-aged management.

Continuous

Generate alternatives for continuous cover management (also referred to as CCF, uneven-aged, or selection harvesting).

FreeDevelopment

Generate an alternative without any treatments.