Difference between revisions of "ControlTable Treatment Program Generator"

From Heureka Wiki
Jump to navigation Jump to search
Line 2: Line 2:
 
In the treatment program generator control table you can configure how treatment programs are generated.
 
In the treatment program generator control table you can configure how treatment programs are generated.
  
== Program Restrictions ==
+
== Program restrictions ==
 
Allows you to control how treatment programs are generated, and how many treatment programs that are generated.
 
Allows you to control how treatment programs are generated, and how many treatment programs that are generated.
  
 
'''CcDelayMax'''
 
'''CcDelayMax'''
:Defines the maximum periods to wait with clearcut after the lowest allowable stand age for clearcutting has been reached.
+
:Defines the maximum periods to await final felling after the corresponding lowest allowable stand age has been reached.
  
 
'''CcDelayMin'''
 
'''CcDelayMin'''
:Defines the minimum periods to wait with clearcut after the lowest allowable stand age for clearcutting has been reached.
+
:Defines the minimum periods to await final felling after the corresponding lowest allowable stand age has been reached.
  
 
'''CcWait'''
 
'''CcWait'''
:Defines the minimum periods between thinning and clearcut.
+
:Defines the minimum periods between thinning and final felling.
 +
 
 +
'''CleaningVariation'''
 +
:Defines the number of periods, from a certain stand age, to vary the simulation of cleaning.
 +
 
 +
'''ManagementSystem'''
 +
:Allows you to select the types of management systems to generate treatment programs according to:
 +
::"EvenAged" generates
  
 
'''MaxAlternatives'''
 
'''MaxAlternatives'''
Line 23: Line 30:
 
:Defines how many periods to vary the first thinning with.
 
:Defines how many periods to vary the first thinning with.
  
== Management Systems ==
 
 
Allows you to select the types of management systems to generate treatment programs for.
 
  
 
'''EvenAged'''
 
'''EvenAged'''

Revision as of 09:08, 19 August 2009

In the treatment program generator control table you can configure how treatment programs are generated.

Program restrictions

Allows you to control how treatment programs are generated, and how many treatment programs that are generated.

CcDelayMax

Defines the maximum periods to await final felling after the corresponding lowest allowable stand age has been reached.

CcDelayMin

Defines the minimum periods to await final felling after the corresponding lowest allowable stand age has been reached.

CcWait

Defines the minimum periods between thinning and final felling.

CleaningVariation

Defines the number of periods, from a certain stand age, to vary the simulation of cleaning.

ManagementSystem

Allows you to select the types of management systems to generate treatment programs according to:
"EvenAged" generates

MaxAlternatives

Defines the maximum number of alternatives that can be generated for a treatment unit.

Model

Defines whether several forest generations are saved in the same alternative (model 1) or if the first and second generations are saved separately (model 2).

ThinningVar

Defines how many periods to vary the first thinning with.


EvenAged

Generate alternatives for even-aged management.

Continuous

Generate alternatives for continuous cover management (also referred to as CCF, uneven-aged, or selection harvesting).

FreeDevelopment

Generate an alternative without any treatments.