ControlTable Treatment Program Generator
Jump to navigation
Jump to search
In the treatment program generator control table you can configure how treatment programs are generated.
Program restrictions
Allows you to control how treatment programs are generated, and how many treatment programs that are generated.
CcDelayMax
- Defines the maximum periods to await final felling after the corresponding lowest allowable stand age has been reached.
CcDelayMin
- Defines the minimum periods to await final felling after the corresponding lowest allowable stand age has been reached.
CcWait
- Defines the minimum periods between thinning and final felling.
CleaningVariation
- Defines the number of periods, from a certain stand age, to vary the simulation of cleaning.
ManagementSystem
- Allows you to select the types of management systems to generate treatment programs according to:
- "EvenAged" generates
MaxAlternatives
- Defines the maximum number of alternatives that can be generated for a treatment unit.
Model
- Defines whether several forest generations are saved in the same alternative (model 1) or if the first and second generations are saved separately (model 2).
ThinningVar
- Defines how many periods to vary the first thinning with.
EvenAged
- Generate alternatives for even-aged management.
Continuous
- Generate alternatives for continuous cover management (also referred to as CCF, uneven-aged, or selection harvesting).
FreeDevelopment
- Generate an alternative without any treatments.