ControlTable Treatment Program Generator
Revision as of 14:07, 4 August 2008 by Fkl (talk | contribs) (New page: Category:Control Tables In the treatment program control table you can configure how treatment programs are generated. == Program Restrictions == Allows you to control how treatment p...)
In the treatment program control table you can configure how treatment programs are generated.
Program Restrictions
Allows you to control how treatment programs are generated, and how many treatment programs that are generated.
CcDelayMax
- Defines the maximum periods to wait with clearcut after the lowest allowable stand age for clearcutting has been reached.
CcDelayMin
- Defines the minimum periods to wait with clearcut after the lowest allowable stand age for clearcutting has been reached.
CcWait
- Defines the minimum periods between thinning and clearcut.
MaxAlternatives
- Defines the maximum number of alternatives that can be generated for a treatment unit
Model
- Defines whether several forest generations are saved in the same alternative (model 1) or if the first and second generations are saved separately (model 2)
ThinningVar
- Defines how many periods to vary the first thinning with.
Treatment Systems
Allows you to define the type of treatment systems to generate treatment programs for.
Continuous
- Generate alternatives for continuous management
EvenAged
- Generate alternatives for even aged management
FreeDevelopment
- Generate an alternative without any treatments